Tuesday, April 23, 2019

1.3.2-GE 9 HA Compressor and Turbine Design


3.3 Casings of Compressor

The casing area of the compressor section is composed of three major sections. These are the:
·         Inlet casing
·         Compressor casing
·         Compressor discharge casing
These casings, in conjunction with the turbine casing, form the primary structure of the gas turbine. they support the rotor at the bearing points and constitute the outer wall of the gas path annulus. All of these casings are split horizontally to facilitate servicing.

3.3.1 Inlet Casing

The inlet casing is located at the forward end of the gas turbine. its primary function is to uniformly direct air into the compressor. the inlet casing also support the No.1 bearing assembly. The No.1 bearing assembly housing is a separate component assembled into the inner bellmouth. The upper half bearing housing is flanged and bolted to the lower half bearing housing. The inner bellmouth is positioned to the outer bellmouth by nine air foil-shaped radial struts. The struts are cast into the support which is bolted and doweled to this inlet casing.
The inlet casing lower half is equipped with two large integrally cast trunnions which are used to lift the gas turbine.
Variable inlet guide vanes (VIGV) are located at the aft end of the inlet casing and are mechanically positioned, by a control ring and vane arm arrangement connected to an actuator drive and linkage arm assembly. The position of these vanes has a effect on the quantity of compressor inlet air flow.

3.3.2 Compressor Casing

The compressor casing contains the variable stator vane stage 1 through stage 3 and the fixed stator stage 4 through stage 8. Each stage of variable stator vanes is mechanically positioned, by a control ring and vane arm arrangement connected to an actuator drive through a torque tube and linkage arm assembly. The positioned of these vanes has an effect on the quantity and efficiency of the compressor air flow.
The aft end of the compressor casing contains extraction ports to permit removal of 8th stage compressor air. This bleed air is used for turbine static hardware cooling functions and is also used for pulsation control during start up and shutdown.

3.3.3 Compressor Discharge Casing

The compressor discharge casing (CDC) is the final portion of the compressor section and is the longest single casting. The CDC is situated at the gas turbine midpoint, between the forward and aft supports, and is, in fact, is the keystone of the gas turbine structure. the CDC contains the final compressor stages 9-14, and contains extraction ports to permit removal of 11th stage compressor air used for turbine static hardware cooling functions.
The CDC and its components form the flow path surfaces of the compressor diffuser, and join the compressor and turbine casings. The CDC also provides support for the combustion casings, transition piece support bracket and the inner support of the first stage turbine nozzle.
The compressor discharge casing consists of two cylinders, one being a continuation of the compressor and the being an inner cylinder that surrounds the compressor rotor. The two cylinders are concentrically positioned by twelve radial struts.
A dual-path diffuser is formed by the tapered annulus between the outer cylinder and inner cylinder of the discharge casing and a third member which splits the compressor flow into two steams. The diffuser converts some of the compressor exit velocity into added static pressure for the combustion air supply.

3.3.4 Blading


The compressor rotor and stator blades are air foil shaped and designed to compress air efficiently at the high blade tip velocities. The blades are attached to the compressor wheels by dovetail arrangements. The dovetails are very precise in size and position to maintain each blade in the desired position and location on the wheel.
The compressor stator blades are air foil shaped and are mounted by similar dovetails into ring segments stage 4 through stage 14 stage 14 and exit guided vane. The ring segments are inserted into circumferential grooves in the casing and are held in place with locking keys. The variable inlet guide vane and variable stator vanes stage 1 through stage 3 are mounted through Trunnion holes in the casing walls and secured with a vane arm and nut assembly.


Saturday, April 13, 2019

1.3.1-GE 9 HA Compressor and Turbine Design


Oo

GE 9 HA Compressor and Turbine Design



1.0  Introduction


1.1 General

The 9HA is a single-shaft gas turbine designed for operation as simple cycle unit or in a combined steam and gas turbine cycle. The gas turbine assembly contains six major section or groups

  1. Air Inlet
  2. Compressor
  3. Combustion system
  4. Turbine
  5.  Exhaust gas system
  6.   Support systems

This section briefly describes how the gas turbine operates and the interrelationship of the major components.

1.2 Gas Path Description

The gas path is the path by which gases flow through the gas turbine from the air inlet through the compressor, combustion section and turbine, to the turbine exhaust.

When the turbine starting system is actuated, ambient air is drawn through the air inlet plenum assembly, filtered and compressed in the multi-stage, axial-flow compressor. For pulsation protection during startup, compressor bleed valves are open and the variable inlet guide vanes (VIGV) and variable stator vanes (VSV) are in the closed position. When the high-speed relay actuates, the bleed valves begin operation automatically and VIGV and VSV actuators energize to position the VIGV and VSV for normal Turbine operation. Compressed air from the compressor flows into the e spaces between the outer combustion casing and the combustion liners and enters the combustion zone through metering holes in each of the combustion liners.
Fuel from an off-base source is provided to flow lines each terminating at the primary and secondary fuel nozzles in the end cover of the separate combustion chambers.


Options:

On liquid fuel machines, the fuel s controlled prior to being distributed to the nozzles to provide an equal flow into each liquid fuel distributor valve mounted on each end cover and each liquid fuel line on each secondary nozzle assembly.
On gas-fuel machines the fuel nozzles are the metering orifices which provide the proper flow into the combustion zones in the chambers.
The nozzles introduce the fuel into the combustion zone within each chamber where it mixes with the combustion air and is ignited by one or more of the spark plugs. At the instant when fuel is ignited in the one combustion chamber flame is propagated, through connecting crossfire tubes, to all other combustion chambers where it is detected by four primary flame detectors, each mounted on a flange provided on the combustion casings.
The combustion hot gases flow through the flow sleeves and transition pieces and into the four-stage turbine section. Each stage consists of a row of fixed nozzles and a row of turbine buckets.
In each nozzle row, the kinetic energy of the jet is increased, with an associated pressure drop, which is absorbed as useful work by the turbine rotor buckets, resulting in shaft rotation used to turn the compressor and generator rotor to generate electrical power.
After passing through the fourth-stage buckets, the gases are directed into the exhaust diffuser. The gases then pass into the exhaust plenum and are introduced to atmosphere through the exhaust stack or go to HRSG in combined cycle mode.

2.0 Base and Supports

2.1   Turbine Base
The base that support the gas turbine is a structural steel fabrication of welded steel beams and plate. Its prime function is to provide a support upon which to mount the gas turbine.
Lifting trunnions and support are provided, two on each side of the base in line with the two structural cross members of the base frame. Machines pads on each side on the bottom of the base facilitate its mounting to the site foundation. Two machines pads, atop the base frame are provided for mounting the aft supports


2.2   Turbine Supports
 The 9HA.01 has rigid leg-type supports at the compressor end and supports with top and bottom pivots at the turbine end. The support legs maintain the axial and vertical positions of the turbine, whole two gib keys coupled with the turbine supports legs maintain its lateral position. One gib key is machined o the lower half of with exhaust frame. The other gib key is machined on the lower half of the compressor inlet casing. The key fit into guide block which are welded to the cross beams of the turbine base. The keys are held securely in place in the guide blocks with bolts that bear against the keys on each side. The key-and-block arrangement prevents lateral or rotational movements of the turbine while permitting axial and radial movement resulting from thermal expansion.

3.0 Compressor Section


3.1 General

The axial-flow compressor section consists of the compressor rotor and the compressor casing. Within the compressor casing are the variable inlet guide vanes, the variable stator vanes, the various stages of rotor and stator blading, the exit guide vanes and the compressor exit diffuser.
In the compressor, air is confined to the space between the rotor and stator where it is compressed in stages by a series of alternate rotating (rotor) and stationary (stator) air-foil-shaped blades. The rotor blades supply the force needed to compress the air in each stage and the stator blades guide the air so that it enters the following rotor stage at the proper angle. The compressed air exits through the compressor discharge casing to the combustion chambers. Air is extracted from the compressor for turbine cooling and for pulsation control during startup.


3.2 Rotor

The compressor portion of the gas turbine is an assembly of wheels, a speed ring, a forward stub shaft (FSS), Tie bolts, the compressor rotor blades, and a mid-shaft.

The first three wheels have slots broached around their periphery. The rotor blades and spacers are inserted into these slots and held in axial position by a ring on the forward side of each wheel. Wheels stages 4 through stage 14 have a circumferential position using blade-locks positioned at several circumferential locations on each wheel. The wheels are assembled to each other with mating rabbets for concentricity control and are held together with tie bolts. Selective positioning of the wheels is made during assembly to reduce balance correction. After assembly, the rotor is dynamically balanced.

The FSS is machined to provide the thrust collar, which carries the forward and aft thrust loads. The FSS also provide the journal for the NO. 1 Bearing, the sealing surface for the No.1 bearing Oil seals and the compressor low pressure air seal.

The Mid shaft provides the sealing surface for several high-pressure air seals, locations of balance weight grooves the compressor-to-turbine marriage flange. Axial holes pass through the aft end of the Mid Shaft to supply the first stage bucket cooling air compressor 14th stage.





Friday, April 12, 2019

1.2.2- 9HA GE Gas Turbine Lubrication Oil System

9 HA GE Gas Turbine Lubrication Oil System


2.4 Heat Exchanger and Filters:

The lubricant oil heat exchangers(LOHX-1 and LOHX-2) connect o the parallel lubricant filters(LF3-1 and LF3-2) This design is provided so that filters not in service can be changed without taking the turbine out of service.

Filter housings and heat exchangers are self-venting. A sight glass is located in the vent line from e filter and heat exchanger. When the heat exhanger and filter housing are full, oil will be visible in this sight glass.

By means of the manually-operated three-way transfer valve, one filter can be put into service as the second is taken out, without interrupting the oil flow to the main lube oil header. The transfer of operation from one filter to the other should be accomplished as follows:

  1.           Close the drain valve of the filter. Open the filter valve and fill the standby filter until a solid oil flow can be seen in the flow sight in filter vent pipe. This will indicate a “filled” condition.
  2.            Operate the transfer valve to bring the standby filter into service.
  3.          Close the filler valve.                                                                                                                   

This procedure simultaneously brings the reserve heat exchanger into service.
Note
Only one heat exchanger is intended to be in service at one time. After transfer, the operator must verify that the cooling water isolation butterfly valves to/from the heat exchanger not in service are closed. Do not leave all four cooling water isolation valves open.

2.5 Seal Oil

The seal oil to the generator bearing is normally supplied by the lubricating system by the lubricating system through a separate line directly to the generator in the event of low lube system pressure or lube system shutdown for service one of two seal oil pumps supply the oil required to seal in the generator hydrogen. Under normal circumstances the AC motor driven pump would serve this function however if this AC motor should fail or if AC power is lost the emergency DC motor is activated and drives the seal oil pump in piggyback AC/DC motor configuration separated AC and DC pumps). The AC motor includes a heater to prevent condensation in the motor. The seal oil pumps circulate oil through filter. Differential pressure switch provides a high differential pressure alarm signal across the filter. The filter element should be replaced near or at the alarm set point.

2.6 Optional Devices

Pressure transmitters

The lubrication module may include the following additional pressure transmitters (indication only) when selected by a customer as an option;
1.      Differential pressure transmitters which provide remote monitoring capability of differential pressure across oil filters.
2.       Pressure transmitter which provides remote monitoring capability of bearing header pressure.
3.       Pressure which provides remote monitoring capability of tank oil level.

These transmitters are indication only devices. They do not alarm or trio the machine in case of failure, low pressure, level etc.



Lube Oil Conditioner

The lube oil system may also include a lube oil conditioner when selected by a customer as an option. The lube oil conditioner is a stand-alone, kidney-loop lube oil conditioning skid designed specifically to remove particulate contamination (from 0.2 to 2 microns in size). Particulate contamination in this size range is the precursor to varnish formation and accumulation. The implementation of lube oil condition together with monitoring and maintenance of the lubrication oil additive package will help prevent the formation and accumulation of varnish and therefore varnish related turbine trips due to sticking hydraulic servo valves etc.) The lube oil condition skid is a standalone customer located skid with all function controlled by an onboard PLC there is no interface to MK VI control system.
Oil entering the Lube oil conditioner skid is monitored for temperature via thermocouple LT-LC. The oil then passes through the pump and into the pre-filter which is monitored for pressure by transducer. The oil then passes into the charging/mixing vessel, which is monitored for pressure by a transducer. Next, the oil moves to the final canister, containing the post-filter which is monitored for pressure by transducer. Finally, oil exiting the skid is monitored for pressure by transducer. All of these devices communicate solely with the PLC onboard the Lube Oil Conditioner Skid.



Tuesday, October 16, 2018

1.2.1- 9HA GE Gas Turbine Lubrication Oil System


9 HA GE Gas Turbine Lubrication Oil System

  1.0 PURPOSE

The lubricating and hydraulic oil, seal oil , lift oil requirement for gas turbine power plant are furnished by a separate, enclosed, forced-feed lubrication module. This lubrication module, complete with tanks, pumps, cooler, filters valves and various control and protection devices, furnishes oil to the gas turbine bearing generator bearing (absorbing the heat rejection load), starting means load gear and on dual fuel units the atomizing air compressor. This module is also used to supply oil for the lift oil system trip oil system and the hydrogen seals on the generator. Additionally, a portion of the pressurized fluid is diverted and filtered again for use by hydraulic control devices as control fluid.
The lubrication system is designed to supply filtered lubricant at the proper temperature and pressure for the operation of the turbine and its associated equipment.

1.1   Major System components include:

1.       Lubricant reservoir which serves as a base for the accessory module.
2.       Two centrifugal pumps each driven by an AC electrical motor. Each AC motor includes a motor space heater to prevent condensation in the motor.
3.       Emergency oil pump with DC motor.
4.       Main seal oil pump driven by AC motor includes motor space heater
5.       Emergency seal oil pump driven by DC motor. Note, in most instances is ‘piggyback’ AC/DC motor driving one pump. If the customer has opted to purchase separate AC and DC seal oil pump, then Two pumps will be there.
6.       Dual lubricating oil heat exchangers in parallel.
7.       Bearing header pressure regulator
8.       Mist Eliminator with redundant fan/motor and motor space heaters.
9.       Pressure protection switches. On dual fuel units, with single atomizing air compressors will have two pressure switches.
10.   Tank temperature thermocouples for pump start permissive and immersion heater control.
11.   Lube Oil header thermocouples.
12.   Lube oil drain thermocouples.
Note: ‘A/B’ indicates dual element thermocouples.
The lube oil is circulated by a redundant set of AC pumps. A DC pump is provided in case AC power to the site is interrupted. These pumps are the first of the auxiliary equipment to be energizes during a startup sequence. Following shutdown of the units, these pumps continue to ru throughout the extensive cool down period and are the last of the auxiliary equipment to be stopped. The lube oil system is self-contained. After lubricating and removing het from the rotating equipment oil is returned to the lube oil tank. It is cooled by oil to water heat exchangers as it is pumped from the tank and re circulated. Various sensing devices are included in the design to ensure adequate oil level in the tank oil pressure and oil temperature.
Oil tank is indicated by a thermocouples on the side of the tank. Thermocouples connected to the control panel indicated lube oil temperature in the bearing header.
Thermocouples in the bearing drains are also wired to the turbine control panel for monitoring a bearing header oil sampling ports are located upstream of bearing header pressure regulator VPR2-1
For turbine starting, a maximum oil viscosity of 800 SUS(173 centi stokes) is specified for reliable operation o the control system and for beating lubricant. Thermocouples prevent turbine startup if the temperature of the lubricant decrease to a point where oil viscosity exceeds 800 SUS(173 centi stokes).

2.0 Functional Description


2.1 Lubricant Reservoir and Piping


The oil reservoir is integral with the module. The interior of the tank is coated with an oil resistant protective coating. The top of the tank is the base on which component s such as the pumps and heat exchangers are mounted.
Under normal operating conditions oil is provided to the system by one of two main ax motor driven centrifugal (PQ1-1 and PQ1-2). The selection of lead and lag pimps is made by the operator through the turbine control, system prior to startup. By alternating the lead/lag pump selection the operating hours can be equalized .Each AC motor includes motor space heaters (23QA-1 and -2) to prevent condensation in the motor. All pumps have a check valve on the discharge line so that oil does not flow into the tank through a pump, which is not in service. Tow pressure switches (63QA-1 and -1B) are mounted in the common header just downstream of the main pumps to ensure proper pump operation. If either of these senses low pressure, an alarm is sounded and lag pump is automatically started. If this occurs, the operator must manually shut off one pump and check that system pressure is stable.
The oil is first pumped through one of the two parallel exchangers. Each is designed to maintain the oil at the proper bearing temperature. The maximum allowable bearing header temperature under normal operating conditions is 160F (71.1C). The oil then flows through one of the two full flow parallel filters. A three way transfer valve controls selection of which set of heat exchangers/filter is in use. The lubricant oil filters have removable filter elements. A differential pressure gauge provides visual indication of the Differential pressure over the filter. Pressure switches provide a high differential pressure alarm signal across each filter .Filter element should be replaced near or at the alarm set point.
Three Taps which are located downstream of the filters, supply lube oil to the generator bearing seals. Hydraulic/lift oil system and trip oil system respectively. Pressure regulating valve then controls the oil pressure to the turbine and generator bearing and the turning gear.
The system is ventilated through a mist eliminator mounted on top of the lube oil reservoir. A slight negative pressure is maintained in the system by redundant motor driven fans pulling air through eliminator. This negative pressure draws sealing air through the gas turbine bearing seals. Each C motor includes a motor space heater to prevent condensation in the motor. The motor driven fans have no DC backup motors and are not required to run in the emergency situation, when the DC pumps has taken over. The fans are set up to run in a lead/lag configuration and are designed to run one at a time. The selection of lead and lag fans is made by the operator through the turbine control system prior to startup. The lag fan takes over whenever the lead fan has failed to run has been overloaded or if there is insufficient vacuum in the lube oil reservoir. If the lag fan is started automatically by the control system due to insufficient tank vacuum level, the lead fan will be automatically shut off.
Pressure switch provides a low differential pressure alarm signal when there is insufficient vacuum in the lube oil reservoir. A regulating valve is downstream of each fan and is adjusted to regulated tank vacuum level.
A level alarm device (float operated) is mounted on the top or side of the reservoir. The float mechanism operates level switches. The switches are connected into the alarm circuit of the turbine control panel to initiate an alarm if the liquid level rises above or falls below the levels shown on the schematic piping diagram the oil level is visually indicated by a gauge mounted on the top or side of the tank an oil drain connection is located on the side of accessory module to drain the reservoir.

2.2 Standby Immersion Heaters


During standby periods, the oil is maintained at a viscosity proper for turbine start-ip by immersion heaters installed din the oil reservoir thermocouples control the heaters and maintain fluid temperature to achieve allowable viscosity if the heaters fail to function and oil reservoir temperature drops below the pout where oil viscosity exceeds 800SUS, thermocouples will initiate a low oil temperature alarm and will prevent a turbine startup while running lube oil header thermocouples constantly monitor the header oil temperature these thermocouples are hardware voted to the median temperature and are wired back to control panel and compared to alarm and trip settings.

2.3 Pressure Protection Devices


Two pressure switches mounted on the main pump discharge header sense lube oil pressure. If either of these senses low lubricant oil pressure an alarm is sounded and the lag pump is automatically started pressure switches in combination with alarm switches, Trip the unit and start the emergency DC motor-driven pump when they sense low pressure. This will occur if AC power is lost. For a trip, one of the two switches and one of the two switches must signal. This voting logic prevents a trip due to a false signal.
The DC emergency pump is designed to provide adequate lube oil circulation for coast down following a trip once the unit is at rest the dc pump should only operate a few minutes per hour, in order to remove het but conserve battery life. If the bearing metal temperature is above 250 F, the DC pump is run continuously. The emergency pump is sized to clear the trip pressure switches but will not clear the alarm pressure level. On the dual fuel units with a single atomizing air compressor a pressure switch is provided at the oil supply to the air compressor gearbox. Two pressure switches on dual fuel units with two atomizing air compressor. These pressure switches will alarm if low pressure is sensed at those points but they will not start the lag pump.

  


Tuesday, October 2, 2018

1.1 9HA (GE Gas Turbine) Combined Cycle Power Plant


#

9HA (GE Gas Turbine) Combined Cycle Power Plant



Gas turbine and combined cycle


The first practical gas turbine was developed at the end do Second World War II in Europe in 1939 for aircraft. Shortly after the war, first industrial gas turbine was developed for production and other industrial application such as driving of locomotive were introducing Gas turbine use another type of cycle called the Brayton Cycle named after its inventor . The first, commercial, industrial gas turbines were relatively inefficient, typically having low thermal efficiency of 16% to 17%. Gas Turbines reached their peak of popularity in early 1970s.
The first major component of combined cycle power plant is gas turbine. In installation where the gas turbine exhausts directly to the atmosphere. It is said to in operating open cycle mode when gas turbine exhausts into the heat recovery steam generator HRSG and the resultant steam is used to operate the steam turbine generator the plant is referred to as combine cycle power plant.

Components of Combined Cycle Power Plant (9HA-GE Gas Turbine and Steam Turbine)

Gas Turbine

Gas turbine power plant has relatively low cost and can be quickly put into commission it requires less space this plant Is heavy capacity and is mainly use for peak load services. Gas turbine power plant is very promising for the region where liquid or gas fuel Is available in large quantities common arrangement of gas turbine driving an electric generator the gas turbine consist of a compressor, combustion chamber, gas turbine and rotor. Air is driven into the compressor from atmosphere, which raises the pressure pf air. The temperature of air also increases with compression its depend upon the design of compressor.

Gas Turbine is an internal combustion engine, like all other combustion engines, gas turbine’s compressor compress air, take in fuel for combustion, and use the resultant volume of hot gases to develop shaft horsepower. Referring the three primary sections of a gas turbine engine are:

1.Compressor
Air is drawn into the air inlet by the compressor. With-in  the compressor air in compressed and at corresponding temperature rise in incurred. The hot compressed air is discharged to the combustion section of the engine,
2 .Combustor
Fuel is admitted into the combustion section by the fuel nozzles. The fuel/air mixture is ignited and combustion occurs.
3. Turbine
The hot and rapidly expended gases are directed through the turbine rotor assembly. Their thermal and kinetic energy are converted into mechanical energy. The gases are expelled out to be the turbine exhaust.

Heat Recovery Steam Generator (HRSG)

The HRSG basically is a heat exchanger composed of High pressure (HP) drum, Low Pressure (LP) drum, High pressure (HP) Super Heater, HP evaporator , HP economizer, and LP evaporator section. These sections are positioned gas inlet to gas outlet to maximizing the heat recovery from the gas turbine exhaust gases The heat recover in the HRSG is used to supply steam to steam turbine at the proper temperature and pressure. For the HRSG feed water requirements a complete feed water system is provide composed of a feed water storage tank, LP feed water pumps, HP feed water pumps and feed water piping system.

Steam Turbine

Steam is an important medium o producing mechanical energy. Steam has the advantage that it can be raised from water, which available in abundance. It does not react with the material of the equipment of power plant and stable at the temperature required in plant. Steam is used to drive steam engine, steam turbines etc. Steam power station is most suitable where all types of fuel are available. Thermal electrical power generation is one of the major methods. For the thermal power plant the range of pressure may vary from (40 bar to 57bar) and the range of temperature is (500 C to 530 C).
The steam Turbine based components include:

·         An Energy resource in the form of flue gases to convert water into steam: Exhaust gases (Gas turbine ) or Flue gases from burning fuel (Oil/gas) directly in a furnace.
·         Steam generator or boiler containing water, Heat generated in the furnace is utilizes to convert water into steam.
·         Main power unit such as a turbine to use the energy of steam and perform work
·         Piping system to convey steam and water
·         Condenser and hot well
·         Cooling water cooling tower and Closed water circulating water pumps.
·         Condensate extraction pumps
·         Air extraction pumps
·         HP & LP Boiler feed water pumps
·         Make up water pumps

Major Electrical Equipment In Power Plant

A power station equipped with electrical equipment for power generation and supply of electrical power. The major electrical equipment in power plant are the following.

1       Generator
2       Transformers
3       Exciters
4       Circuit Breakers
5       Reactors
6       Switch Board
7       Control Board Equipment’s
8       Other Auxiliaries

Generator

It is an importan part of a power palnt all modern types of alternating current generators essentially consist of a fixed stator and revolving rotor
Stator consist of following three parts

  •         Stator Frame
  •         Stator core
  •         Stator winding


The stator frame is of circular in shape and is made of welded steel plates. The core is made of stamping soft high permeability, low hysteresis and eddy current losses. The stator is generally built in cylindrical form and diameter of rotor is limited . Large numbers of deep slots are machined in the rotor to accommodate the field windings which will carry field currents. Generators coupled directly to the steam turbine are turbo generators and those coupled directly to water turbine are called water wheel-generator.

Generator Constants

The following details of generator should be known to determine their performance in the power system under different loading conditions.

1.      KVA Rating
2.      Number of Phases
3.      Frequency
4.      Number of Poles
5.      Voltage
6.      Temperature rise limits
7.      Power Factor cos ɸ
8.      Star connection of stator

Generator Cooling Methods

The two methods commonly used for generator cooling are as follows:

1      Air Cooling
2      Hydrogen Cooling

Hydrogen Cooling is far more effective than that of Air cooling because of the cooling capacity of hydrogen. As cooling is generator is directly related to its effectiveness to convert mechanical power into electrical energy, hydrogen cooling is now being used in heavy duty generators to increase the production capacities of generator as compared to that generators with air cooling.

Power Block Main Components

Main Components of a power plant include:

1       Gas Turbine-main prime mover

2       HRSG –Exhaust gas boilers

3       Steam Turbine – Secondary power prime mover

4       Generators – Coupled with prime movers either on same shaft or different shafts

5       Power Transformers- To step up the Voltage produce in generator to distribute electrical power

6       Auxiliary Transformers – To step down voltages from main generator to supply power to auxiliary components (which require much lower voltages to that produce in main generators)

7       Breakers (on load device) – Heavy duty circuit breakers to On and OFF high voltage lines

8       Isolators (off load device) – To electrical isolate the equipment to ensure safety

9      Switchyard – the Station of power transformers, isolators, Bus bars, protection relays, electrical feeders and breakers etc.

1     Hydrogen Plant – To generate and store hydrogen gas to fill in the generators when require
1    
           Water Treatment – To treat water to get water with specific quality to ensure no corrosion, scaling, mud accumulation and to any other treatment to be done to safe piping and related equipment.
       DEMI Plant – De mineralized the water to use for steam production

1     Fuel Gas Supply system – To supply gas at specific pressure, temperature and quality

1     Fuel Gas Conditioning system – To treat the gas before inserting into turbine combustion chambers

1     Liquid fuel storage tanks and supply pumps – To ensure quantity of liquid to be used in emergency and fuel change over

      Liquid fuel Injection pumps – To inject the liquid in atomize form required certain high pressure pumps

Power Plant Auxiliaries

1 Gas Turbine(GT GE 9HA) Auxiliaries

·         GT Start-up system LCI(Line Commutated Inverter)
·         GT Turning gear motor
·         GT Lube Oil Pumps and system
·         GT Fuel Gas supply system
·         GT Liquid Fuel system
·         GT compartments exhaust and inlet blowers for cooling
·         GT Generator Excitation System

2  HRSG Auxiliaries
·         High Pressure Boiler Feed water pumps
·         Low Pressure boiler Feed water Pumps

3  Steam Turbine Auxiliaries
·         ST Lube Oil pumps and system
·         Condensate Extraction Pumps
·         ST Generator seal oil system
·         ST Generator Excitation System

GE 9HA Gas Turbine Components


Gas Turbine plant contains parts and sections:
·         Gas Turbine
·         Gas Turbine Auxiliary systems
·         Gas Turbine Auxiliary system modules
·         Acoustic Enclosures
·         Generator
·         Generator Auxiliary systems
·         Electrical Starting means
·         Electrical energy evacuation
·         Power Distribution systems

It contain information related to AC and DC supply. It may include the parts below as applicable:
1.      Battery, battery rack and related accessories
2.      Battery charger
3.      Motor control center
4.      LV switch Board Container
5.      MV Switch Board Container
6.      Container, Miscellaneous Functions

·         Control Equipment

These equipment include the parts below:
1.       Packaged Electrical/ Electronic Control Compartment (PEECC)
2.       Gas Turbine speedtronic Control System (Mark-VI E)
3.       Human Machine Interface or DCS
4.       Generator control System
5.       Generator Protection Panel
6.       Generator Excitation Panel
7.       Auxiliary Panel

·         Monitoring Equipment

This volume Includes monitoring equipment such as:
1.      Vibration monitoring
2.      Hazardous gas monitor
3.      Smoke Analyzer
4.      Station Vibration Data Manager
5.      Partial Discharge Analysis Monitor

·         Balance Of Plant (BOP Equipment)

·         Combined Cycle(CC) Equipment


Further Insight into Gas Turbine GE 9HA

·         Gas Turbine Instrumentation (control/measuring devices)
·         Lubrication System
·         Cooling and Sealing Air System
·         Trip Oil system
·         Closed Cooling Water System (CCW)
·         Starting means system (Turning gear & LCI/SFC/Starting Motor)
·         Gas fuel System
·         Water Injection System
·         Fire detection & protection system
·         Hydraulic supply system
·         Heating and Ventilation System
·         Cleaning System
·         Compressor Washing system (off-line and 0on-line Washing)
·         Inlet Guide vanes system (IGV)
·         Inlet and exhaust system
·         Variable Stator vanes (VSV)
·         Hazardous Gas detection system
·         Fuel Purge system
·         Performance System
·         Liquid Fuel Inhibitor System
·         Accessory and Load gear system
·         Miscellaneous piping connections